Project Name: GAC FCA K4
Tach Requirement: 177s
Process Description: Arc Welding + Marking + Assembly
Equipment Description: This project utilizes two arc welding workstations with rotary tables to perform arc welding operations. The robotic welding fixtures utilize electronic control and inspection, with error prevention features. The robot's workstation configuration utilizes a horizontal three-axis positioner. While the robot is welding on the inside, the operator can simultaneously work on the other side, ensuring non-stop operation and significantly improving robot utilization.
Project Name: Rear Wheel Cover Assembly
Vehicle Type: Renault X1213
Takeoff Time: 90s
Process Description: Robotic spot welding + automated handling + online marking
Project Name: A-pillar outer panel reinforcement assembly
Vehicle: Renault H1213
Takeoff time: 55 seconds
Process: Robotic spot welding + automated handling + online marking
Project Name: Front Bracket (Radiator Bracket) Assembly
Vehicle Type: Dongfeng Honda T4N
Tact Requirement: 45s (1,000 units production capacity)
Process Description: Robotic spot welding + automatic handling
Equipment Description: Highly automated, with only four operators operating the entire production line
Project Name: Door Sill Assembly
Vehicle Type: Great Wall X01
Takeoff Requirement: 45s
Process Description: Robotic spot welding + automatic handling + in-line nut inspection
Project Name: GAC A20 Door Knob Production Line;
Product: Door Knob Assembly;
Typ. Required: 55s;
Process: Projection welding + welding + arc welding + automatic grinding;
Equipment Description: This project includes two spot welding systems, three handling robots, and one grinding robot on each side. The handling robots perform the workpiece processing, including automatic projection welding of nut plates, fixed-torch welding, and fixed-arc welding. A single robot performs the automatic grinding process.